1 Installation Preparations                                                                  1-1

1.1 About the Equipment                                                                   1-2

1.2 Installation Flow Chart                                                                 1-3

1.3 Preparations                                                                               1-5

1.3.1 Technical Documents on Construction                                  1-5

1.3.2 Tools and Meters                                                                 1-5

1.3.3 Checking the Environment and Grounding                            1-6

1.4 Unpacking Cabinet                                                                      1-7

1.5 Unpacking Subrack                                                                    1-10

1.6 Unpacking Board                                                                       1-11

1.7 Checking Equipment Before Installation                                      1-13

2 Installing Subrack                                                                             2-1

2.1 Install the Subrack                                                                       2-2

2.1.1 Procedure                                                                          2-2

2.1.2 Installation Check                                                                2-4

2.2 Installation Check Points                                                              2-5

3 Installing the Cabinet on the ESD Protection Floor                   3-1

3.1 Positioning the Cabinet                                                                3-2

3.1.1 Positioning an Independently Installed Cabinet                     3-2

3.1.2 Positioning a Cabinet Close to Another One                          3-3

3.1.3 Installation Check                                                                3-4

3.2 Positioning the Support                                                                3-5

3.2.1 Procedure                                                                          3-5

3.2.2 Installation Check                                                                3-6

3.3 Installing the Support                                                                   3-7

3.3.1 Procedure                                                                          3-9

3.3.2 Installation Check                                                              3-12

3.4 Installing the Cabinet on Support                                                3-13

3.4.1 Procedure                                                                         3-14

3.4.2 Installation Check                                                              3-17

3.5 Installation Check Points                                                            3-19

4 Installing Cabinet on the Cement Floor                                        4-1

4.1 Positioning the Cabinet                                                                4-2

4.1.1 Positioning an Independently Installed Cabinet                     4-2

4.1.2 Positioning a Cabinet Close to Another One                          4-4

4.1.3 Installation Check                                                                4-5

4.2 Installing the Cabinet on the Cement Floor                                    4-6

4.2.1 Procedure                                                                          4-7

4.2.2 Installation Check                                                              4-10

4.3 Installation Check Points                                                            4-11

5 Fixing Cabinet                                                                                    5-1

5.1 Combining Cabinets                                                                    5-2

5.1.1 Procedure                                                                          5-2

5.1.2 Installation Check                                                                5-3

5.2 Fixing Cabinets on an Overhead Cabling Frame                            5-5

5.2.1 Fixing Cabinet on a Cabling Frame with a Side Trough (H £ 200 mm)                                                                                            5-7

5.2.2 Fixing Cabinet on a Cabling Frame with a Side Trough (H > 200 mm)                                                                                            5-8

5.2.3 Fixing Cabinet on a Cabling Frame without a Side Trough (H £ 200 mm)                                                                                     5-9

Похожие материалы

Информация о работе