Installation Preparations. Technical Documents on Construction. Checking Equipment Before Installation. Checking the Environment and Grounding, страница 7

Figure 9-8 Expected result of installed front/rear door                                    9-10

Figure 9-9 Position numbers of equipment in the equipment room                  9-11

Figure 9-10 Outer views of the cabinet labels                                                9-12

Figure A-1 Layout of the equipment room                                                       A-3

Figure A-2 Internal partition wall of the equipment room                                  A-5

Figure A-3 Transient noises                                                                         A-14

Figure C-1 Bundling cables                                                                           C-2

Figure D-1 Label for signal cables                                                                 D-2

Figure D-2 Label for power cables                                                                 D-3

Figure D-3 Label for signal cables                                                                 D-4

Figure D-4 Template of label                                                                         D-6

Figure D-5 Warning prompt before printing                                                     D-7

Figure D-6 Handwriting direction of the label                                                  D-9

Figure D-7 Affixing a label to a signal cable                                                  D-10

Figure D-8 Appearance of labels affixed on identification plates                     D-11

Figure D-9 Example of the labels on the DC power cable                              D-12

Figure D-10 Example of a label for alarm cables                                           D-14

Figure D-11 Example of a label on the Ethernet cable                                   D-15

Figure D-12 Example of the label on the optical fiber between two devices     D-17

Figure D-13 Example of the label on the optical fiber between the device and the ODF                                                                                                     D-18

Figure D-14 Example of a label for clock cable                                             D-19

Figure E-1 Outer view of binding strap                                                           E-2

Figure E-2 Install the binding strap on a cutterbar                                           E-3

Figure E-3 Cut the binding strap                                                                    E-3

Figure E-4 Bundle the fiber jumpers – step 1                                                  E-4

Figure E-5 Bundle the fiber jumpers – step 2                                                  E-5

Figure E-6 Expected result of the bundled fiber jumpers                                  E-5


Tables

Table 1-1 The contents of Chapter 1                                                               1-1

Table 1-2 Tools and meters required for installation                                         1-5

Table 1-3 Equipment check before installation                                               1-13

Table 2-1 The contents of Chapter 2                                                               2-1

Table 2-2 Positions where the front and rear mounting brackets are fixed          2-2

Table 3-1 The contents of Chapter 3                                                               3-1

Table 3-2 Support specifications                                                                     3-8

Table 4-1 The contents of Chapter 4                                                               4-1

Table 5-1 The contents of Chapter 5                                                               5-1

Table 6-1 The contents of Chapter 6                                                               6-1

Table 6-2 Widths of front panels                                                                     6-3

Table 6-3 Boards of the OptiX OSN 9500                                                        6-5

Table 6-4 Positions of captive nuts for fixing the HUB in the cabinet                6-19

Table 7-1 The contents of Chapter 7                                                               7-1