8 Installing Fiber Jumper 8-1
8.1 Installing External Fiber Jumpers 8-2
8.1.1 Procedures in Upward Cabling Mode 8-3
8.1.2 Procedures in Downward Cabling Mode 8-6
8.2 Installation Check Points 8-8
9 Installing Doors and Side Panels of the Cabinet 9-1
9.1 Installing Side Panels 9-2
9.1.1 Procedure 9-2
9.1.2 Installation Check 9-3
9.2 Installing Front and Rear Doors 9-5
9.2.1 Installing the Plastic Panel 9-5
9.2.2 Procedure 9-6
9.2.3 Opening the Door 9-8
9.2.4 Closing the Door 9-9
9.2.5 Installation Check 9-9
9.3 Affixing the Cabinet Labels 9-11
9.3.1 Procedure 9-12
9.3.2 Installation Check 9-12
9.4 Installation Check Points 9-13
A Operation Environment Requirements A-1
A.1 Layout of Equipment Room A-3
A.2 Construction of the Equipment Room A-4
A.3 Cleanliness of the Equipment Room A-6
A.4 Temperature and Humidity A-7
A.5 Corrosive Gas Control Requirements A-8
A.6 Electromagnetic Requirements A-8
A.7 Antistatic Protection A-9
A.8 Lightening Protection and Grounding Requirements A-9
A.9 Power Supply A-11
A.10 Lighting in the Equipment Room A-15
A.11 Protection System A-15
B Grounding B-1
B.1 General Grounding Specifications B-1
B.2 Grounding Specifications for the Equipment Room Building B-2
B.3 Equipment Grounding Specifications B-2
B.4 Grounding Specifications for the Power Supply of Communication Equipment B-3
B.5 Grounding Specifications for Signal Cable B-4
B.6 Cabling Specifications for Grounding Cable B-5
C Cabling and Bundling C-1
C.1 Cabling C-1
C.2 Bundling C-2
D Engineering Labels for Cables D-1
D.1 Introduction to Labels D-2
D.1.1 Material D-2
D.1.2 Type and Shape D-2