Contents
1 Installation Preparations 1-1
1.1 About the Equipment 1-2
1.2 Installation Flow Chart 1-3
1.3 Preparations 1-5
1.3.1 Technical Documents on Construction 1-5
1.3.2 Tools and Meters 1-5
1.3.3 Checking the Environment and Grounding 1-6
1.4 Unpacking Cabinet 1-7
1.5 Unpacking Subrack 1-10
1.6 Unpacking Board 1-11
1.7 Checking Equipment Before Installation 1-13
2 Installing Subrack 2-1
2.1 Install the Subrack 2-2
2.1.1 Procedure 2-2
2.1.2 Installation Check 2-4
2.2 Installation Check Points 2-5
3 Installing the Cabinet on the ESD Protection Floor 3-1
3.1 Positioning the Cabinet 3-2
3.1.1 Positioning an Independently Installed Cabinet 3-2
3.1.2 Positioning a Cabinet Close to Another One 3-3
3.1.3 Installation Check 3-4
3.2 Positioning the Support 3-5
3.2.1 Procedure 3-5
3.2.2 Installation Check 3-6
3.3 Installing the Support 3-7
3.3.1 Procedure 3-9
3.3.2 Installation Check 3-12
3.4 Installing the Cabinet on Support 3-13
3.4.1 Procedure 3-14
3.4.2 Installation Check 3-17
3.5 Installation Check Points 3-19
4 Installing Cabinet on the Cement Floor 4-1
4.1 Positioning the Cabinet 4-2
4.1.1 Positioning an Independently Installed Cabinet 4-2
4.1.2 Positioning a Cabinet Close to Another One 4-4
4.1.3 Installation Check 4-5
4.2 Installing the Cabinet on the Cement Floor 4-6
4.2.1 Procedure 4-7
4.2.2 Installation Check 4-10
4.3 Installation Check Points 4-11
5 Fixing Cabinet 5-1
5.1 Combining Cabinets 5-2
5.1.1 Procedure 5-2
5.1.2 Installation Check 5-3
5.2 Fixing Cabinets on an Overhead Cabling Frame 5-5
5.2.1 Fixing Cabinet on a Cabling Frame with a Side Trough (H £ 200 mm) 5-7
5.2.2 Fixing Cabinet on a Cabling Frame with a Side Trough (H > 200 mm) 5-8
5.2.3 Fixing Cabinet on a Cabling Frame without a Side Trough (H £ 200 mm) 5-9