  1. Install planetary shaft assembly (121), two thrust discs (122), two caged bearings (123), and gear (124) to planetary carrier (109) .
  1. Use a suitable drift in order to install spring pin (120) into planetary carrier (109) .
  1. Repeat Steps 96 and 97 for the remaining three planetary shaft assemblies.

View Image

https://sis.cat.com/sisfiles/g00/534/g00534067.jpg


Illustration 69

g00534067

  1. Use Tooling (A) to install ball bearing (118) into planetary carrier (109) .

View Image

https://sis.cat.com/sisfiles/g00/534/g00534066.jpg


Illustration 70

g00534066

  1. Use Tooling (A) and a suitable press in order to install bearing retainer (119) into planetary carrier (109) .

View Image

https://sis.cat.com/sisfiles/g00/530/g00530920.jpg


Illustration 71

g00530920

  1. Install retaining ring (116) onto sun gear (115) .
  1. Slide hub (117) onto sun gear (115) until retaining ring (116) locks onto the groove on hub (117) .

View Image

https://sis.cat.com/sisfiles/g00/530/g00530907.jpg


Illustration 72

g00530907

  1. Position sun gear (115), as shown.
  1. Install two seal rings (114) to sun gear (115) .

View Image

https://sis.cat.com/sisfiles/g00/530/g00530900.jpg


Illustration 73

g00530900

  1. Install retaining ring (111) onto planetary carrier (109).
  1. Install O-ring seal (112) onto bearing retainer (113) .

View Image

https://sis.cat.com/sisfiles/g00/534/g00534071.jpg


Illustration 74

g00534071

  1. Use a suitable lifting device (not shown) and a hoist to position sun gear (115) and hub (117) onto the shaft as a unit. The weight of sun gear (115) and hub (117) as a unit is 24 kg (52 lb).

View Image

https://sis.cat.com/sisfiles/g00/534/g00534072.jpg


Illustration 75

g00534072

  1. Install friction disc (127) into the clutch housing.
  1. Install clutch plate (128) into the clutch housing.
  1. Repeat Steps 108 through 109 for the remaining three friction discs and the two clutch plates.

View Image

https://sis.cat.com/sisfiles/g00/530/g00530898.gif


Illustration 76

g00530898

  1. Install Tooling (E) to planetary carrier (109). Attach Tooling (E) to a suitable lifting device and a hoist.
  1. Use Tooling (E) and the hoist to position planetary carrier (109) onto the sun gear. The weight of planetary carrier (109) is 57 kg (125 lb).
  1. Use 12 bolts (110) and the washers in order to install planetary carrier (109) to the sun gear. Tighten 12 bolts (110) to a torque of 115 ± 7 N·m (85 ± 5 lb ft).

View Image

https://sis.cat.com/sisfiles/g00/530/g00530873.jpg


Illustration 77

g00530873

  1. Install four dowels (107) and two balls (108) into clutch housing (102) .

View Image

https://sis.cat.com/sisfiles/g00/530/g00530860.jpg


Illustration 78

g00530860

  1. Install internal seal ring (105) and external seal ring (106) onto clutch piston (104) .