Designing and analysis ACS (курсовая работа на английском языке), страница 3

 Standard TP

 Work TP

005

 Delivery

 To unpack an electronic component, plates. To check up absence of disturbance of exterior

010

Preparatory

 To receive an electronic component, plates. To check up the complete set on conformity to the drawing

015

Wash down  

Wash plates from acetone-colophony lacquer

020

Marking

 Deposition of the cipher of plate, factory number

025

Drying

 Drying

030

Tinning

Tinning of electronic component outlet

035

Assembly

Assembly installation of resistors, capacitors, diodes, transistors

040

Assembly

Establish and fix an electronic component with male outlet

045

Soldering

 Soldering by a wave of solder

050

Assembly

 To check plate and to tin defective soldered connections

055

Wash down

 To wash plates from a flux after mounting

060

Verifying

 To check up exterior of plate, quality of soldering

065

Control

 To check up exterior of plate in Quality Department

070

Vibration test

 Vibration test

075

Lacquering

Lacquering

080

Assembly

Installation of the connector

085

Test for vibration resistance

 Tests for vibration resistance

090

Verifying

 To check up plate it agrees TC on electric parameters

095

Tests climatic

 Tests climatic

100

Technological training

 Check of stability of plate to temperature drops

105

Control of plate

 To check up exterior of plate

110

Delivery

 To present plate on acceptance in Quality Department

115

Control

 To check up exterior of plate to issue the accompanying documentation

Selection of the equipment, appliances and tools

The equipment, appliances, tools which are necessary for fulfillment of worker TP, in view of type of manufacture (series production), are listed in table

                                                                                                    table

NOP

  Equipment

Appliance

  Tool

005

 Workbench

 Container shop, magnifying glass ЗP-1-2,5

 Scissors rectangular NP120 BST 4. GO.060.014, universal assembly knife KUM 130

010

  Workbench

015

 Vibroplant Т85-80-95

Cartridge for the installation of plates

020

 Workbench

025

 Vacuum thermostat

Appliance for the installation in the thermostat 6358-2745

030

Semiautomatic devi-ce of tinning, model PLS, GG-2166

Appliance for installation МС

035

 Automatic control unit GTMT.149.006

 Container shop

045

Installation of soldering, model АP-4,

Container shop

 Brush panel КFК6

050

Workbench 2-1-1

 Support ГГ7879-4121 BST4. GO.060.053

 the soldering iron electric ТТО 838-1011 (25Wt), a tweezers of a WPT 80, BST 4. GО.060.013, magnifying glass LP-2,5 SBST 7594-75

055

 Installation ultrasonic Т85-80-95 USO-25.013.836.014

Cartridge for the installation of plates

060

 Workplace of the assembler

 Magnifying glass LP1-2,5 SBST 7594-75

065

 Table of quality department

070

 Vibroplant

 Appliance for fastening plates, container shop

  Set of wrenches of SBST 2839-80, a screw-driver of SBST 17199-71

075

Exhaust case, a drying case

Ditch for lacquering

080

Workbench

Support, container shop

 Screw-driver OSKS;key KTNST

085

 Vibroplant CTA

Appliance for fastening plates, container such as EP

Set of wrenches of SBST 2839-80, a screw-driver of SBST 17199-71

090

Table assembly

 KTA it agrees TNAT, container such as EP

095

  cold chamber, a hot chamber

 KTA it agrees TNAT

100

 the cold Chamber, a hot chamber

 KTA it agrees TNAT

105

Table assembly

 Magnifying glass PCB1-2,5 SBST 7594-75

110

Workplace of the traffic controller

Operational technology (Optimization of operations)

Optimization of operations it is spent on an example of manual soldering of an electro soldering iron and the automated soldering by a wave of solder on the installation of soldering AP-4. Initial data for optimization are duration of transitions of operations of the manual and mechanized soldering.