Construction of 220 kV Lafarge substation. Book 1 “Electrical solutions”, страница 3


Section5. Sub-section 1.  Electrical power supply system.

5

Section5. Sub-section 1.Volume 1.  Electrotechnical solutions

67177-811/821- ИОС1.1

Short circuit current on 220kV substation “Stany”. Load spesification 35kV and 6 kV substation

5.1


Explanatory note

67177-811/821- ИОС1.1_с.1-с.17

FER.811.J05.001

5.2

220/35/6,6 kV Main substation principle electric diagram

67177-811/821- ИОС1.1_л.1

FER.811.N05.001

5.3

Calculation of short circuit currents in collector bus bard 220, 35 and 6,6 kV. Selection and test of cables  35 kV

67177-811/821- ИОС1.1_л.2

л2.1-л2.21

FER.811.U05.001

01-21

5.4

220/35/6,6 кВ  Power transformer load calculation

67177-811/821- ИОС1.1_л.3

л3.1-л3.4

FER.811.U05.010

01-04

5.5

Electrical auxiliaries. Wiring diagram

67177-811/821- ИОС1.1_л.4

FER.831.N05.001

5.6

0.4 kV network load calculation

67177-811/821- ИОС1.1_л.5

FER.831.U05.001

5.7

Direct current wiring diagram

67177-811/821- ИОС1.1_л.6

FER.831.N05.010

Cheboksary branch

5.8

Schematic diagram of the network coverage. Power equipment. Exterior lighting

67177-811/821- ИОС1.1_л.7

л7.1-л7.10

FER.831.N05.020

5.9

Fire and security alarm

67177-811/821- ИОС1.1_л.8

л8.1-л8.4

FER.821.N05.001

01-04

Location information about duty staff on the plant

5.10

Outdoor switchgear 220 kV and power transformers layout

67177-811/821- ИОС1.1_л.9 л9.1,л9.2

FER.811.D05.001

01,02

5.11

Reducing station  equipment layout

67177-811/821- ИОС1.1_л.10

FER.821.D05.001

5.12

Equipment, items and materials specification

67177-811/821- ИОС1.1_СО

FER.821.K05.001

5.13

Power transformers 220/35/6,6 kV. Data sheet

67177-811/821- ИОС1.1_ОЛ1

1-2

FER.811.U05.020

01-02

5.14

Circuit braker 220 kV. Data sheet.

67177-811/821- ИОС1.1_ОЛ2

FER.811.U05.030

5.15

Switch disconnector 220 kV. Data sheet.

67177-811/821- ИОС1.1_ОЛ3    1,2

FER.811.U05.040 01,02

5.16

Current transformers 220 kV.  Data sheet

67177-811/821- ИОС1.1_ОЛ4

FER.811.U05.050

5.17

Voltage transformers 220 kV . Data sheet

67177-811/821- ИОС1.1_ОЛ5

FER.811.U05.060

5.18

Surge arrester 220 kv. Data sheet

67177-811/821- ИОС1.1_ОЛ6

FER.811.U05.070

5.19

Power equipment 35kV. Data Sheet

67177-811/821- ИОС1.1_ОЛ7

1-7

FER.822.U05.001

01-07

5.24

Neutral Earthing Resistor 35 kV. Data sheet

67177-811/821- ИОС1.1_ОЛ12

FER.831.U05.017

6

Section5. Sub-section 1.Volume 2.Relay protection and automation

67177-811/821- ИОС1.2

220 kV  “Stany” destribution substation on lines discharge to 220kV Lafarge substation.

6.1


Explanatory note

67177-811/821- ИОС1.2_с.1-с.X

FER.811.J05.100

Checking calculation on current transformer,voltage transformer, predetermined level

6.2

Relay protection and automation equipment layout in current transformer and voltage transformer

67177-811/821- ИОС1.2_л.1

FER.811.N05.010

6.3

Protection and automation devices layout

67177-811/821- ИОС1.2_л.2

FER.821.D05.010

6.4

Equipment specification

67177-811/821- ИОС1.2_С

FER.821.K05.010

7

Section5.Sub-section 1.Volume 3. Automated control system

67177-811/821- ИОС1.3

Automatic process control system: control building location,communication bus, communication protocol

7.1

Explanatory note

67177-811/821- ИОС1.3_с.1-с.Х

FER.811.J05.200

7.2

Block diagram

67177-811/821- ИОС1.3_л.1

FER.821.N05.010

7.3

Remote control, remote metering and remote signaling signals list

67177-811/821- ИОС1.3_л.2

FER.821.N05.020

7.4

Automated control system equipment location plan

67177-811/821- ИОС1.3_л.3

FER.821.D05.020

7.5

Equipment specification

67177-811/821- ИОС1.3_СО

FER.821.K05.020

8

Section5. Sub-section 1.Volume 4.Development of actions in maintenance of electromagnetic compatibility

67177-811/821- ИОС1.4

8.1

Explanatory note

67177-811/821- ИОС1.4_с.1-с.Х

FER.811.J05.300

8.2

Sub-station grounding device. External  grounding device

67177-811/821- ИОС1.4_л.1

FER.811.D05.010

8.3

Substation grounding device.System of potentials equalizing

67177-811/821- ИОС1.4_л.2

FER.811.N05.020

9

Section5. Sub-section 2. Water supply system

67177-811/821- ИОС2

Ситуационный план, сводный план инженерных сетей завода/Site plan, summary plan of engineering lines

9.1

Explanatory note

67177-811/821- ИОС2_с.1-с.2

FER.821.J05.001

9.2

Water pipeline layout

67177-811/821- ИОС2_л.1 л1.1,л1.2

FER.821.D05.030

9.3

Pipeline network system

67177-811/821- ИОС2_л.2

FER.821.F05.001

9.4

Equipment and materials specification

67177-811/821- ИОС2_СО

FER.821.K05.030

10

Section5. Sub-section 3. Water disposal system

67177-811/821- ИОС3

Site plan, summary plan of engineering lines

10.1

Explanatory note

67177-811/821- ИОС3_с.1-с.2

FER.821.J05.100

10.2

Sewerage system layout

67177-811/821- ИОС3_л.1

л1.1,л1.2

FER.821.D05.040

10.3

Sewerage system diagram

67177-811/821- ИОС3_л.2

FER.821.F05.010

10.4

Equipment and materials specification

67177-811/821- ИОС3_СО

FER.821.K05.040

11

Section5. Sub-section 4. Heating, air ventilation and conditioning, heat supply network

67177-811/821- ИОС4

11.1

Explanatory note

67177-811/821- ИОС4_с.1-с.4

FER.821.J05.200

11.2

Performance of heat and ventilation systems

67177-811/821- ИОС4_л.1

FER.821.Z05.001

11.3

Equipment layout

67177-811/821- ИОС4_л.2

л.2.1,л.2.2

FER.821.D05.050

11.4

Equipment, products and materials specification

67177-811/821- ИОС4_СО

FER.821.K05.050

12

Section5. Sub-section 5. Communications network

67177-811/821- ИОС5

12.1

Explanatory note

67177-811/821- ИОС5_с.1-с.Х

FER.821.J05.300

12.2

Communication network. Schematic diagram

67177-811/821- ИОС5_л.1

FER.821.N05.030

Connection diagram of the plant, placement of spanned items

12.3

Communication network. Equipment location layout

67177-811/821- ИОС5_л.2

FER.821.D05.060

12.4

Equipment, items and materials specification

67177-811/821- ИОС5_С

FER.821.K05.060

13

Section 6. Construction management plan

67177-811/821- ПОС

Equipment, construction section dump area, location for garbage

13.1

Explanatory note

67177-811/821- ПОС _с.1-с.30

FER.811.J06.001

13.2

Construction general plan

67177-811/821- ПОС _л.1

л.1.1, л.1.2

FER.811.B06.001

01, 02

14

Section 8. Environmental protection measures

67177-811/821- ООС

14.1

Explanatory note

67177-811/821- ООС _с.1-с.Х

FER.811.J08.001

            5

Section 9. Fire safety measures

67177-811/821- ПБ

Location information about duty staff

15.1

Explanatory note

67177-811/821- ПБ _с.1-с.Х

FER.811.J09.001

15.2

Evacuation plan

67177-811/821- ПБ _л.1

FER.811.F09.001

15.3

Fire safety arrangement plan

67177-811/821- ПБ _л.2

FER.811.B09.001

16

Section 10. Measures for energy efficiency and capability of energy metering devices in buildings, structures and facilities

67177-811/821- ЭЭФ

16.1

Explanatory note

67177-811/821- ЭЭФ _с.1-с.Х

FER.821.J10.001

16.2

The diagram of the devices arrangement of the account of power resources

67177-811/821- ЭЭФ _л.1

FER.821.D10.001

17

Section 11. Cost estimate for contruction

67177-811/821- СМ

17.1

Explanatory note

67177-811/821- СМ_с.1-с.Х

FER.811.J11.001

17.2

Cost estimate for project

67177-811/821- ОС

FER.811.Q11.001

17.3

Local cost estimate for "Ground area layout"

67177-811/821- ЛС.1

FER.811.Q11.050

17.4

Local cost estimate for  "Architectural and civil engineering concept"

67177-811/821- ЛС.2

FER.811.Q11.100

17.5

Local cost estimate for "Structural concept"

67177-811/821- ЛС.3

FER.811.Q11.150

17.6

Local cost estimate for "Power supply system"

67177-811/821- ЛС.4

FER.811.Q11.200

Equipment and materials price-list

17.7

Local cost estimate for "Water supply system"

67177-811/821- ЛС.5

FER.811.Q11.250

17.8

Local cost estimate for "Water disposal system"

67177-811/821- ЛС.6

FER.811.Q11.300

17.9

Local cost estimate for "Heating, air ventilation and conditioning, heat supply network"

67177-811/821- ЛС.7

FER.811.Q11.350

17.10

Local cost estimate  for "Communication system"

67177-811/821- ЛС.8

FER.811.Q11.400

18

Section 12. Actions for counteraction to acts of terrorism

67177-811/821-ПЗ

FER.811.J12.001