Installation Preparations. Technical Documents on Construction. Checking Equipment Before Installation. Checking the Environment and Grounding, страница 5

Figure 3-10 Install the fixing brackets for pallets                                            3-12

Figure 3-11 Expected result of installed support                                            3-12

Figure 3-12 Bolt assembly                                                                           3-13

Figure 3-13 Demount feet of the cabinet                                                       3-15

Figure 3-14 Level and secure the cabinet                                                     3-16

Figure 3-15 Install the floor pallet                                                                  3-17

Figure 3-16 Expected result of installation on the ESD floor                           3-18

Figure 4-1 Position an independently installed cabinet                                     4-3

Figure 4-2 Plate for marking the cabinet layout                                               4-3

Figure 4-3 Position a cabinet close to another one                                          4-4

Figure 4-4 M12 x 100 bolt assembly                                                               4-6

Figure 4-5 Install the expansion tube and expansion nut                                  4-8

Figure 4-6 Demount feet of the cabinet                                                           4-9

Figure 4-7 Level and secure the cabinet on cement floor                                 4-9

Figure 4-8 Expected result of the cabinet installed on cement floor                 4-10

Figure 5-1 Bolt assembly                                                                               5-2

Figure 5-2 Combining cabinets                                                                      5-3

Figure 5-3 Expected result of combined cabinets                                            5-4

Figure 5-4 Flow chart of installing cabinet fixing parts                                      5-6

Figure 5-5 Bolt assembly                                                                               5-6

Figure 5-6 Install the cabinet on a cabling frame with a side trough (H £ 200 mm)                                                                                                       5-7

Figure 5-7 Fix the cabinet on a cabling frame with a side trough (H >200 mm)  5-9

Figure 5-8 Fix the cabinet on a cabling frame without a side trough ( H£200 mm)                                                                                                      5-10

Figure 5-9 Fix the cabinet on a cabling frame without a side trough ( H >200 mm)                                                                                                      5-11

Figure 6-1 Outer view of a board                                                                    6-3

Figure 6-2 Slot assignment                                                                            6-4

Figure 6-3 Position of the ESD jack                                                                6-7

Figure 6-4 Remove the filler panel                                                                  6-8

Figure 6-5 Plug a board                                                                                 6-8

Figure 6-6 Unplug a board                                                                             6-9

Figure 6-7 Install a filler panel                                                                      6-10

Figure 6-8 Positions for the cabling troughs                                                   6-12

Figure 6-9 Install the cabling troughs                                                            6-13

Figure 6-10 Install the fan boxes and the air filter on the subrack                    6-14

Figure 6-11 Install the fan boxes and the air filter                                           6-15

Figure 6-12 Location of the fastening screw of the air filter                             6-16

Figure 6-13 Install the orderwire phone                                                         6-18

Figure 6-14 Install the HUB                                                                          6-20

Figure 6-15 Position of the HUB power interface                                           6-20